中文版 |
I'm Zhao Wei in the Technical Department of Dongfang Electric Wind Power Co., LTD., in Deyang City, Sichuan Province, P.R. China. Now, I'm the deputy chief of system simulation section, in charge of wind turbine load calculation, control algorithm, design of blade.
Programming, especially for scientific and engineering purpose, in C++, Matlab, Python and JAVA.
Astronomy, especially viewing universe at night.
Outdoor sports, hiking, camping, travelling, adventure.
Scientific and engineering books, Sci-fictions and Sci-Fi movies.
This program is used to extrapolate 50-year return period extreme loads of wind turbine as IEC 61400-1. Wind turbines - Part1: Design requirements, 3rd edition. 2005. Three weibull parameters distribution for short-term extreme load distribution is used,the scale parameter,the location parameter and the shape parameter are estimated using the L-moment method.
DECWT(Dongfang Electric Corporation Wind Turbine)
Calculate power curve, thrust coefficient, Cp and AEP of wind turbine at different air density; compare power production for all kinds of schemes for a wind farm, internal use only.
After micro-siting, carry out feasibility analysis for each wind turbine, considering turbulence intensity, wind distribution, air density, etc. factors, currently is under developed.
赵伟,郑北超, 曾庆忠,浅谈风力发电机组的设计流程,东方电机,2012年05期 [pdf]
赵伟,王良文, 徐中明, 张志飞, 张文金,塔式起重机整体结构有限元分析,机械与电子,2006年10期 [pdf]
赵伟, 张志飞,彭旭阳, 徐中明, 第九届全国振动理论及应用学术会议论文集,ATV车体动特性分析 [pdf]
王清波,赵伟, 曾庆忠,统计外推法在风力发电机载荷分析中的应用,东方电机,2012年05期 [pdf]
王清波,赵伟, 低温型风电机组研究初探,中国风能杂志,2014年11期[pdf]
李声茂, 赵伟, 抗震设计条件下的风电机组载荷计算,中国风能杂志,2013年02期 [pdf]
曾庆忠,郑北超, 赵伟, 基于热点应力的塔筒门洞焊缝疲劳分析,东方电机,2012年06期 [pdf]
Update:2015/06/02 |